Skip to content
MVC Windows & Doors logo

Permits and approvals for impact windows and doors

Getting impact windows and doors approved takes more than choosing the right product. Depending on the property, that means the product’s approval, a city or county permit, the association’s sign-off and, on some commercial jobs, the architect’s. We prepare the documents and follow them through to final inspection and a closed permit.

What has to be approved

Every property needs its own set of approvals

Permitting impact windows and doors takes more than submitting an application. Every project has to meet the building code, the product approval requirements and the rules of the local jurisdiction. Depending on the property, that can include:

  • Product approval — that the selected windows and doors carry the Florida Product Approval or Miami-Dade NOA the project requires.
  • City or county permit — the building permit, with the plans, applications and supporting documents it asks for.
  • HOA or association approval — when the property sits under an association’s architectural review.
  • Architect or design professional — on certain commercial or architecturally controlled projects.

We coordinate that documentation and keep the application moving from submission to final approval.

Seen from directly above: a set of architectural drawings open on a pale desk, the sheet showing the line elevation of a single-storey house and a window section detail beside it, weighted at one corner by a short offcut of dark bronze aluminium window profile, with two rolled sheets, a teal folder, a steel ruler and a mechanical pencil around it and palm shadows falling across the desk

The process at a glance

Nine steps, one coordinated process

You don’t have to work through the permitting process alone. This is the whole path at a glance; each step is explained further down.

Proposal

Steps 1–3

  1. Measure and assess

    Accurate measurements and an evaluation of every opening.

  2. Prepare your proposal

    The right products for the wind-load requirements of the property.

  3. Contract and agreement

    Your project officially begins.

Permit

Steps 4–7

  1. Plans and engineering

    Plans prepared with the engineers the project needs.

  2. HOA approval

    When the property requires it.

  3. Permit submission

    The city or county application.

  4. Plan review and approval

    Plans reviewed and the permit issued.

Delivery and closure

Steps 8–9

  1. Manufacturing and delivery

    Units made to the approved documents and delivered labelled.

  2. Inspection and permit closure

    Final inspections and a closed permit.

The process

From contract to permit closure

One project, one coordinated process, from the first measurement to a closed permit.

  1. Site measurement and assessment

    MVC handles it

    Before the final proposal, we visit the property to measure the existing windows and doors and evaluate each opening. That tells us which products and configurations each opening needs for the wind load at that location, its size and the building requirements that apply. When the permit calls for it, we also take photographs and prepare a floor plan.

  2. Proposal and product selection

    MVC handles itWithin 48 hours

    With what we gathered at the property, we prepare a detailed estimate: the impact windows and doors, their sizes, configurations and specifications. The proposal is delivered within 48 hours of the measurement, once the information the project needs is in hand.

  3. Your approval and the contract

    You do it

    You review the proposal and approve it, and we move on to the formal contract. From here the project enters our permitting and coordination process.

  4. Plans and engineering

    MVC handles it

    Our permitting team starts on the documents the project needs, coordinating with the engineers and design professionals who finalise the plans, the anchoring details, the product information and the other technical documents the jurisdiction requires.

  5. HOA or association approval

    MVC handles it

    If the property is in an HOA, a condominium or another association that requires architectural approval, we coordinate the submission to the board. When that approval is required, we obtain it before the municipal permit is filed.

  6. Permit preparation and submission

    MVC handles it

    With the plans and approvals ready, we put together the permit package for the building department that will review it: the applications and forms, the supporting documents, the signatures of the property owner and the contractor, notarisation where it is required, and the engineering and plan documents. Then the complete package is submitted.

  7. Plan review and approval

    The county or city does it

    The city or county plan reviewers go through the plans and supporting documents. We follow the application through review and coordinate the answers to any comments or requests for more documents. Once the plans are approved, the permit is issued.

  8. Manufacturing and delivery

    MVC handles it

    With the permit issued, the units are manufactured to the approved plans and delivered with their approval labels on them. The work on site follows the approved drawings and the anchoring detail each product approval dictates, and the labels have to stay legible for the inspector.

  9. Inspections and permit closure

    MVC handles it

    Once the work on site is complete, we coordinate the required inspections with the jurisdiction. When the inspections pass and every approval is in, we complete the permit closure.

Questions about permits and approvals

Can I pull the permit myself?

In some cases, yes, as an owner-builder, depending on the property, the project and the jurisdiction. But permitting impact windows and doors is more than an application: plans, product approvals, engineering documents and inspections can all be part of it. We can coordinate the process for you and work with the professionals who prepare those documents.

Is there any job small enough not to need a permit?

Permit requirements depend on the type and scope of the work and on the local building department. Replacing exterior windows and doors generally requires a permit, particularly with impact-rated products. Because the rules vary by jurisdiction, confirm what your property needs before any work begins.

How long will my permit take?

It depends on the city or county, the complexity of the project, the plan reviewers’ workload and whether revisions or more documents are requested. We submit the documentation and follow the application through review. We cannot control how long the jurisdiction takes, but we keep the application moving and answer its requests as quickly as we can.

What is a Notice of Commencement and do I need one?

A Notice of Commencement (NOC) is a document that records the key facts of a construction project: the property, the owner, the contractor and the work. Whether you need one depends on the project and on Florida’s requirements. When it is required, it generally has to be recorded and posted before certain work begins. We can coordinate it as part of the permit paperwork.

Is a Florida Product Approval the same as a Miami-Dade NOA?

No. They are two different approval systems. A Florida Product Approval (FL#) is a statewide approval issued through the Florida Building Commission. A Miami-Dade Notice of Acceptance (NOA) is issued through Miami-Dade County’s Product Control program. Inside the High Velocity Hurricane Zone (HVHZ) additional requirements apply, and which approval is needed depends on the product, the property’s location and the building requirements that apply to it.

Does a Notice of Acceptance expire?

Yes. A Miami-Dade NOA has an approval period and can be revised, renewed or superseded. That is why the approval to check is the current one for the specific product on your project, not an old document or approval number.

What happens if a permit is never closed?

An open permit can stay attached to the property and complicate selling, refinancing, insuring or doing future work on it. If an earlier window or door project was finished but the permit was never closed, how to resolve it depends on the jurisdiction and the circumstances of the permit. If you have an old or open permit, contact us and we can help you understand the next steps.

My association has to approve it too. Where do I start?

If the property is in an HOA, a condominium or another association, architectural approval may be needed before the city or county permit can move forward. Associations may ask for product information, colour selections, drawings, photographs or their own architectural forms. We can coordinate that submission and, when it is required, obtain the association’s approval before the municipal permit is filed.

Can I choose any frame colour I want?

Not necessarily. The product may come in several frame colours, but the property may be subject to HOA, condominium, historic or other architectural requirements. If an association has to approve it, the colour and configuration may need that approval before the project goes ahead. Confirm the approved colour and configuration before the final order is placed.

What will my insurance company want to see?

It varies by carrier and policy. Your insurer may ask for documentation showing the windows and doors are impact-rated and were installed to their approval: product approval documents, installation records, inspection reports or other supporting documents. Ask your insurance provider exactly which documents they need for your property.

The paperwork is part of the process

We coordinate the documents and approvals your project needs, from measurement and product selection to permit approval, inspections and a closed permit.

Get a free estimate